發(fā)電機組的檢查與安裝

來源:http://m.maryke8.com/ 文章作者:濟柴環(huán)能 發(fā)布時間:2022-01-26
發(fā)電機組的安裝問題是比較重要的,大家可以選擇合適的位置安裝,選擇的安裝地點要有良好的通風(fēng)條件,發(fā)電機端的進風(fēng)口要開的夠大,柴油端的要具備良好的出風(fēng)口,出風(fēng)口的面積起碼要比水箱的面積大一倍。安裝現(xiàn)場周圍應(yīng)保持清潔,不得在附近放置酸、堿等能產(chǎn)生腐蝕性氣體和蒸汽的物品。如果條件允許,應(yīng)提供滅火裝置。
The installation of the generator set is more important. You can choose a suitable location for installation. The selected installation location should have good ventilation conditions. The air inlet at the generator end should be large enough, and the diesel end should have a good air outlet. The area of the air outlet should be at least twice that of the water tank. The surroundings of the installation site shall be kept clean, and acid, alkali and other articles that can produce corrosive gas and steam shall not be placed nearby. If conditions permit, fire extinguishing devices shall be provided.
室內(nèi)使用時,排氣管須引至室外,管道直徑須≥消聲器排氣管直徑,連接管道的彎頭數(shù)量不應(yīng)超過3個,以保障排氣通暢,管道向下傾斜5-10度,避免雨水噴射;如果排氣管垂直向上安裝時,須安裝防雨罩。當(dāng)基礎(chǔ)為混凝土?xí)r,在安裝過程中,應(yīng)用水平尺測量水平度,使單位固定在水平的基礎(chǔ)上。在單位和基礎(chǔ)之間應(yīng)有特殊的防震墊或腳螺栓。
When used indoors, the exhaust pipe must be led to the outside, the diameter of the pipe must be ≥ the diameter of the exhaust pipe of the muffler, and the number of elbows connecting the pipe should not exceed 3, so as to ensure smooth exhaust. The pipe is inclined downward by 5-10 degrees to avoid rainwater spraying; If the exhaust pipe is installed vertically upward, a rain cover must be installed. When the foundation is concrete, the levelness shall be measured with a level ruler during installation to fix the unit on the horizontal foundation. Special shockproof pads or foot bolts shall be provided between the unit and the foundation.
發(fā)電機組的檢查與安裝問題
Inspection and installation of generator set
燃油發(fā)電機組到達現(xiàn)場后,應(yīng)放在水平位置,避免陽光直射或下雨,嚴(yán)禁放在基站發(fā)電,嚴(yán)禁發(fā)電機的進排氣口對準(zhǔn)入口。將油機的輸出電纜連接到開關(guān)箱的油機口,保障可靠的連接和隔緣措施,并鎖好開關(guān)箱門、或向上風(fēng)方向排放廢氣。接好燃油發(fā)電機的接地線,鋪設(shè)好接地樁,保障接地連接可靠。將開關(guān)箱中的制動刀切換到機組位置,保障其可靠。
After arriving at the site, the fuel generator set shall be placed in a horizontal position to avoid direct sunlight or rain. It is strictly prohibited to put it in the base station for power generation, and it is strictly prohibited to align the inlet and exhaust ports of the generator with the inlet. Connect the output cable of the oil engine to the oil engine port of the switch box, ensure reliable connection and edge separation measures, and lock the door of the switch box or discharge waste gas in the upwind direction. Connect the grounding wire of the fuel generator and lay the grounding pile to ensure reliable grounding connection. Switch the brake knife in the switch box to the unit position to ensure its reliability.
開關(guān)箱基站在保障交流輸入總開關(guān)斷開的前提下,應(yīng)切除基站交流輸入零線,做好隔緣保護,并將油機輸出電纜的備用輸出接入交流電。應(yīng)打開基站的分配屏幕,以保障備用輸出容量與油機容量匹配。
On the premise of ensuring the disconnection of the main AC input switch, the base station of the switch box shall cut off the AC input zero line of the base station, do a good job of edge protection, and connect the standby output of the oil engine output cable to AC. The allocation screen of the base station shall be opened to ensure that the standby output capacity matches the oil engine capacity.
檢查機組安裝工程各項內(nèi)容有否正確施工完成。包括電路、油管、水管安裝連接有否正確合理、進出風(fēng)道、排煙管道、各樣吸隔音工程和各個處理設(shè)備有無不足之處,同時各附屬工作(保溫、清潔等)有否跟上完成。多種設(shè)施的連接固定是否結(jié)實。在柴油發(fā)電機組安裝工程穩(wěn)定合理情況下,檢驗發(fā)電機房設(shè)計布局情況,現(xiàn)場開啟發(fā)電機,監(jiān)測機房內(nèi)外噪音和排煙出口煙色濃度,合格通過。
Check whether all contents of the unit installation project are correctly completed. Including whether the installation and connection of circuits, oil pipes and water pipes are correct and reasonable, whether there are deficiencies in inlet and outlet air ducts, smoke exhaust pipes, various sound absorption and insulation works and various treatment equipment, and whether all ancillary works (thermal insulation, cleaning, etc.) have been completed. Whether the connection and fixation of various facilities are firm. When the diesel generator set installation works are stable and reasonable, check the design layout of the generator room, start the generator on site, monitor the noise inside and outside the machine room and the smoke concentration at the smoke exhaust outlet, and pass the test.

相關(guān)產(chǎn)品 / Related products

聯(lián)系我們
    濟南濟柴環(huán)能燃氣發(fā)電設(shè)備有限公司
  • 國內(nèi)業(yè)務(wù):羅總18653152416
    王總13012995645
  • 國外業(yè)務(wù):李總18668968402
    張總18678860619
  • 座 機:0531-62325028 / 69951266
  • 傳 真:0531-69958299
  • 郵 箱:hengnenghr@163.com
  • 地 址:中國(山東)自由貿(mào)易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓101
濟南濟柴環(huán)能燃氣發(fā)電設(shè)備有限公司     網(wǎng)站備案號:魯ICP備18052890號-3  網(wǎng)站地圖 XML TXT

截屏,微信識別二維碼

微信號:王總13012995645

點擊微信號復(fù)制,添加好友

 打開微信